The parts are not complete yet but I can start building the hull. There are other parts needed.
- The tower for the propeller
- Mounting brackets for the 2-idler pulleys
- Fuel tank and hose and mounting location
- Battery for starter and accessories and mounting location
- Steering wheel, steering shaft, steering cables to rudder
- Brake system - cable, bungie cord
- Engine Manual
- Charging System
- Safety Switch, Engine Kill Switch
- Battery Disconnect Switch
- Fan Guard netting or wire guard
- Stereo Wiring - (4) 6.5" speakers Marine
- Subwoofer - Baselink
- Horn
- Marine Safety Equipment
- Anchor and mounting points
- Space for:
- Fire Extinguisher
- Floatation Device
- Mooring Rope
- Instrumentation
- MPH
- RPM
- FUEL
- COMPASS
- CLOCK
- GPS
Build an integrated tower? Purpose?
- Support the propeller guard
- Mounting for headlights
- Mounting for Marine lights
- Mounting for flag advertising pole
Material? Foam - Aluminum - Stainless Steel
I need to schedule my time so I can work on this project. The estimated time is 200 hours.
If I spend 20 hours per week it will take 10 weeks. That's 2 and 1/2 months.
If I start this coming week - 2 hrs. per day for 5 days then 10 hrs on the weekend.
July 1, 8, 15, - 4 weeks
July 22, 29 (Out of Town)
Aug. 5, 12, 19, 26 - 8 weeks
Sept. 2, 9, - 10 weeks
This is at a 10 week project and I need to remain focused.
I need to spend 20 hrs per week for the next 10 week to complete the craft and I still need to find or build a trailer to test.
I should be spending 2 hrs. per day 5 days a week and 10 hrs. on Satudays. I need to schedule the other things that I want to accomplish as I go.